(1.) FOR the sake of convenience, the parties are referred to in accordance with their ranks in the original suit and in appropriate places, their ranks in the second appeal shall also be referred to.
(2.) THE plaintiff in the original suit is the appellant in the second appeal. The suit was filed for permanent injunction and mandatory injunction. Contending that the site belonged to Therezhundur Perumal Temple and the same was taken on lease by the plaintiff's father Abdul Salam some thirty years prior to the filing of the suit, whereupon he put up a hut and started residing therein; that on 18.08.1991 under a deed of settlement, the father of the plaintiff gifted the said property to the plaintiff and that thus the plaintiff became entitled to the superstructure and the leasehold right in respect of the land, the suit came to be filed by the plaintiff (appellant herein). It was his further contention that the defendants, who are having their house on the west of the suit property, taking advantage of the natural obliteration of the fence, trespassed into a portion of the property and made an attempt to put up a toilet in the trespassed area; that the said attempt was prevented by the plaintiff and then a suit in O.S. No. 46/1995 came to be filed by the plaintiff in the court of District Munsif, Mayiladuthurai in which an interim injunction was obtained; that disregarding and violating the order of interim injunction, the first defendant removed the parent wall of her property, a mud wall constructed abutting the parent wall of the property of the appellant/plaintiff and that hence the appellant/plaintiff was forced to approach the court for a permanent injunction against the respondents/defendants not to demolish the western wall of the plaintiff and for a mandatory injunction directing the defendants to remove the construction put up in the encroached portion and hand over possession of the encroached area to the plaintiff. The western wall of the plaintiff's house has been shown in Plaint 'A' schedule whereas the alleged encroached portion is shown in 'C' schedule and the construction put up in the alleged encroached portion has been shown in plaint 'B' schedule. From the description of the properties found in the plaint, it can be discerned that the leasehold land of the plaintiff lies on the east and the leasehold land of the defendants lies on the west and both are adjacent lands. The house of the plaintiff situates on the northern portion of her lease hold land, whereas the southern part has been used as garden in the backyard.
(3.) AFTER framing necessary issues a trial was conducted. Three witnesses were examined as PWs.1 to 3 and two documents were marked as Exs.A1 and A2 on the side of the plaintiff. One witness was examined as DW1 and no document was produced on the side of the defendants.