(1.) NATIONAL Thermal Power Corporation Ltd(NTPC) is the Appellant.
(2.) AGGRIEVED over the orders impugned dated 21.01.2011 and 15.6.2011 disallowing the NTPC to capitalise the cost of Auto Coal Sampler installed at Singrauli Thermal Power Station, the Appellant has filed this Appeal.
(3.) THE short facts are as follows: